Chevron

Multi-material Divider Walls
Steel, Laminate, Wood, Leather Canvas
In partnership with:
Gensler
Harvey Cleary
  • Delivered 45 multi-material divider walls across nine floors of a high-security facility.
  • Successfully completed procurement, fabrication, and installation within a condensed 15-week timeline.
  • Defined and achieved critical milestones to maintain an aggressive production schedule.
  • Partnered with Gensler to engineer design and source materials that met design intent,  fire-code compliance, and lead times.
Custom divider wall of woven leather straps on a black steel frame with a rust-red laminate base, fabricated by FMW FabLab for Chevron’s Houston office.
Close-up of a leather strap with a steel buckle wrapped around black steel rods on a Chevron divider wall.
Woven leather and steel divider walls framing a booth seating area with purple walls and a pendant light.
See all projects
Bold black right-pointing arrow symbol.
2025 FMW|FabLab